Call Now — Free Estimate: 📞 (877) 349-1553 24/7
EMERGENCY STORM REPAIR info@davisroofingandmaintenance.com
(877) 349-1553
Home Services All Services Roof Replacement Roof Repair Storm Damage Repair New Roof Installation Metal Roofing Shingle Roofing Flat Roofing Commercial Roofing Gutter Installation Roof Inspection Emergency Roof Repair Skylight Installation About Locations All Locations Fort Apache, AZ Houck, AZ Mayer, AZ Payson, AZ Roll, AZ Somerton, AZ Vail, AZ Apache Junction, AZ Chinle, AZ Reviews Contact (877) 349-1553
★★★★★ 4.7 Stars · 142+ Reviews

New Construction Roofing | Forest Lakes, AZ

Same-Day Appointments Available  ·  24/7 Emergency Service

Full-Service Roofing in Forest Lakes. Forest Lakes Roofing & Maintenance — 4.7-Star Rated, 142+ Reviews.

Call (877) 349-1553
📞 (877) 349-1553

Insurance claim deadline approaching? We handle the full claims process.

Same-Day Service Licensed & Insured Free Estimates
<60 Min
Response Time
17+
Years Experience
4.7
Star Rating
142+
Happy Reviews

Building a new home or adding on to your existing one? Forest Lakes Roofing & Maintenance handles new roof installation from decking to ridge cap. We work with your general contractor or architect to coordinate scheduling, material selection, and code compliance for your Forest Lakes build.

Our New Roof Installation Process

1

Plan Review & Consultation

We review your building plans, discuss material options, and calculate ventilation requirements. Roof pitch, attic space, local code amendments, and your aesthetic preferences all factor into the recommendation.

2

Pre-Installation Setup

Materials delivered and staged on-site the day before installation. Shingle pallets, underlayment rolls, flashing stock, ridge vent, and fasteners, everything confirmed against the project spec sheet.

3

Certified Installation

Our Forest Lakes crew installs every layer to manufacturer specifications: underlayment, ice and water shield, drip edge, starter strip, field material, hip and ridge caps, and ventilation. Every fastener placed per the manufacturer nailing schedule.

4

Warranty Registration

We schedule the building inspection and walk the roof with the inspector. Your manufacturer warranty gets registered the same day the roof passes inspection. You receive warranty paperwork within a week.

What Forest Lakes Customers Say

★★★★★ 4.7/5 from 142+ reviews
★★★★★

"Responded fast and got the job done right the first time. Crew was polite, professional, and cleaned up everything. Would absolutely hire again."

A
Andrew P., Forest Lakes
★★★★★

"We called expecting to wait days, but they were here the same afternoon. Fair pricing, quality work, and they kept us informed every step of the way."

S
Steven C., Forest Lakes
★★★★★

"After getting several quotes, these guys stood out with their honesty and knowledge. No pressure, just straightforward advice and excellent workmanship."

K
Karen E., Forest Lakes
Join 142+ Happy Customers — Call (877) 349-1553

Why Choose Forest Lakes Roofing & Maintenance for New Roof Installation?

Builder Coordination

We work directly with your GC on scheduling, staging, and inspections. On-time delivery and clean work that doesn't slow down the rest of the build.

Material Selection Guidance

Shingles, metal, flat systems. We install all of them and help you choose based on your budget, design, and the demands of AZ climate.

New Construction Specialists

We install new roofs on new builds every week. Our Forest Lakes crews know the pace, the coordination, and the quality standards that new construction demands.

Ventilation Design

We calculate intake and exhaust per IRC R806 for every new install. Balanced ventilation extends roof life and cuts energy costs. Most contractors skip this step.

New Roof Installation FAQ

Absolutely. We tie new roofing into existing roof structures with proper flashing and waterproofing at the transition. Matching the existing shingle color and profile is standard practice.

Critical. Improper ventilation causes premature shingle aging, ice dams in cold weather, and excessive attic heat in summer. We calculate intake and exhaust per code requirements. Balanced ventilation extends roof life and reduces energy costs.

One to three days for most residential projects. Standard homes are typically done in one day. Larger custom builds or complex multi-material roofs take two to three days. We coordinate timing with your GC.

Have More Questions? Call (877) 349-1553

SAME-DAY APPOINTMENTS AVAILABLE

Every Day You Wait Costs More. Call (877) 349-1553 Now.

24/7 emergency service. Most appointments available within 48 hours.

Call Now — Free Estimate
📞 (877) 349-1553

★★★★★ 4.7/5 from 142+ Reviews  ·  Licensed  ·  Insured

About Our Forest Lakes New Roof Installation Services

Whether it's GAF Timberline HDZ, Owens Corning Duration, CertainTeed Landmark, or a standing seam metal system, our Forest Lakes crews install it the way the manufacturer requires. Factory-certified installation means your warranty is fully backed from day one.

Call (877) 349-1553 for a free consultation on your new build. We review plans, recommend materials, calculate ventilation, and provide a detailed proposal. Whether you're building a custom home or adding a 200 square foot covered patio, Forest Lakes Roofing & Maintenance has the experience to do it right.

← All Services New Roof Installation in Fort Apache → New Roof Installation in Houck → New Roof Installation in Mayer → New Roof Installation in Payson → New Roof Installation in Roll → New Roof Installation in Somerton →
📞